Langston St. Water Line

Langston St. Waterline Project


All work completed by the city of Willard Public Works department

  • 500’ of 6” C900 waterline. This waterline replaced a 2” galvanized, that was severely undersized, as well as having a long history of leaks

  • 4 driveway culverts replaced with ADS pipe. Only one of the existing culverts was able to move water

  • Ditching all along Langston. This road had no ditching before the project and was plagued by flooding. We were able to add this into the project for no extra money

  • Total cost of the project not including labor was $14,000

  • If this project were to be bid out to a contractor it could easily exceed $60,000