Langston St. Waterline Project
All work completed by the city of Willard Public Works department
500’ of 6” C900 waterline. This waterline replaced a 2” galvanized, that was severely undersized, as well as having a long history of leaks
4 driveway culverts replaced with ADS pipe. Only one of the existing culverts was able to move water
Ditching all along Langston. This road had no ditching before the project and was plagued by flooding. We were able to add this into the project for no extra money
Total cost of the project not including labor was $14,000
If this project were to be bid out to a contractor it could easily exceed $60,000